The height of the watering fissures is 21.5m because the height of caving zone is about 10m after the mining of all the 3 seam ( 4 layers), and the result basically accord to the result of theoretic calculating and numerical simulation;

  • 3煤层全采后(4个分层)垮落带高度为10m左右,导水裂隙带的高度为21.5m,与理论计算和数值模拟结果基本一致;

  • 互联网摘选 2025-01-20 12:42:08

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句