To investigate the subsynchronous oscillation ( SSO) problem of the steam turbine generators near the rectifier station of Guizhou-Guangdong ⅱ± 500 kV DC transmission link, the unit interaction factor ( UIF) analysis and the time domain simulation methods are adopted.

  • 针对贵广二回直流输电系统可能引起整流站附近汽轮发电机组次同步振荡的问题,采用机组作用系数法和时域仿真方法进行了分析。