The crossway parallel operations were adopted in the second stage to install the equipments, from the host, cables, instruments to nuclear reactor components.

  • 第二阶段是设备安装,从主机、电缆、仪表到核反应堆部件采取平行交叉的方式作业。

  • 互联网摘选 2025-01-20 17:37:33

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句