The existing anchorage system for prestressed tendons and cables of steel is no longer appropriate for that of FRP due to their low transverse shear strength and crushing resistance.

  • 但其横向抗剪及抗挤压强度较低,现有的预应力筋和拉索锚具体系不再适用于FRP预应力筋和拉索。

  • 互联网摘选 2025-01-20 11:45:24

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句