By plotting operation time of individual equipment of the car dumping on wagon tipper line on a diagram and indicating switching condition of operation, it is possible to calculate car unloading cycle time with consideration of factors which affect the car unloading cycle.

  • 用作图法列出翻车机卸车作业线各环节的作业时间、各设备之间的转换条件等,可算出卸车周期以及影响卸车周期的因素。