The transformation of 10000m 3/ h ASU is described in detail, including removal of lean Kr/ Xe and crude Ne/ He systems; pipe rearrangement within the cold box; serial connection of the steam heater with the electric heater.

  • 详细介绍了对10000m3/h空分设备进行的切除贫氪氙和粗氖氦系统、整改冷箱内管道及串联蒸汽加热器和电加热器改造情况,分析了改造效果及改造后还存在的不足。

  • 互联网摘选 2025-01-20 12:40:59

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句