From four stages of construction duration, 1~ 2 year-running, time limit and designing applicative expectation, analysis is made on the formations and causes of the broken concrete pavement for the slippery modularization construction, and given the countermeasures.

  • 从施工期、通车1~2、使用期、设计使用寿命终了期等四个阶段,分析了滑模施工水泥混凝土路面断板的种类和产生的原因,并提出了断板的具体处理方法。

  • 互联网摘选 2025-01-20 00:02:46

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句