The construction technology of well point unwatering method, manual pore-forming, manual cut deep concret and erratic boulder, static blast are applied in the foundation project, which solves the problem of the new tower built in the old site.

  • 桩基础方案采用井点降水、人工成孔、深层混凝土和大漂石人工切割与静力爆破施工工艺,成功解决了原塔旧址新建问题。

  • 互联网摘选 2025-01-20 11:58:35

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句