However, often because of the time restraints in design phase, the structures design alternatives, cost estimating and optimization are seldom considered in the structure engineering.

  • 但是,由于设计阶段的时间限制,一般很少针对结构工程进行多方案的设计、成本估计和优化。

  • 互联网摘选 2025-01-20 17:28:05

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句