Since the oil tanker wharf of Talien New Port located in deep water, in order to decrease the external force and make a faster time schedule of erection, the large-scale precast concrete caission is chosen as underwater structure of the gravity-pier.

  • 大连新港原油码头水深大,为了减小墩子所受的外力并加快施工进度,采用了大型预制钢筋混凝土圆沉箱作为重力墩水下部分的结构。

  • 互联网摘选 2025-01-20 19:04:54

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句