The method was adapt broad crested weir theory derivation to calculation flood rate of discharge and conjecture design rate of discharge through field investigate information of bridge.

  • 该计算方法是通过实地调查桥前水深等资料,采用严密的宽顶堰理论推导,求得洪水流量,进而推求设计流量。

  • 互联网摘选 2025-01-20 00:02:57

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句