Based on the case analysis on pre-stressed tubular pile construction in Shantou district in these years, according to the characters of engineering geological condition and working experience, some discussion on design and construction of pre-stressed tubular pile are made.

  • 通过对汕头地区预应力管桩历年来的施工实例资料分析,根据汕头地区工程地质条件的特点和实践经验,对预应力管桩的设计、施工提出几点探讨性意见。

  • 互联网摘选 2025-01-20 11:38:53

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句