The article sets forth the route to control the engineering construction cost in the construction period after the completion of the bidding and tendering procedure from the aspects of signing the construction contracts, optimizing the design of construction organization and making out the budget of the construction drawings.

  • 该文从签订施工合同、优化施工组织设计、做好施工图预算等方面阐述了在招标投标程序完成后进入施工阶段控制工程造价的途径。

  • 互联网摘选 2025-01-20 11:54:34

    • 相关例句
    精确
    • 模糊
    • 词首
    • 词尾
    • 词义
    • 例句